£

cart

Cart is empty

Sub total:
total:

Assembly Instructions for Buildaline

Note: Lubricate threads with duck oil before assembly (or a similar commercial lubricant may be used). Goodridge recommend that the
finished assembly is fully pressure tested prior to use.

Step 1

 

Step 2

 

Step 3

 

 Fit in place the banjo adaptors with the bolts and the correct amount of washers. Our recommended torque setting for this is 14 – 24 ft/lbs. This torque setting is advisory for the fittings, NOT for your master cylinder or calipers. Care must be taken not to damage either your master cylinder or calipers. Please also ensure that you have chosen the correct threaded bolt for your application.

Locate the correct length hose. Route the hose safely, ensuring that it cannot be damaged by daily use of your bike, when the steering is at full lock. Use tube clamps if necessary (SBKPLCC-05) to help with the routing.

Screw the hose onto the banjo adaptors, making sure that it has been fully tightened. Tip - As a rough guide, finger tight then a ¼ turn will give you 14 ft/lbs.

Step 4

 

Step 5

 

Step 6

 

P-Clips (SBKPLCC-05) are available to ensure that your hoses are routed correctly.

 Bleed your brakes correctly and carefully following any special bleeding sequence as recommended in your bike manual. Use the manufactures recommended brake fluid. Goodridge recommend a high quality DOT 4 fluid

TEST FOR ANY LEAKS

After using your bike for the first time, we recommend that you give your brakes and fittings a thorough inspection to check for any leaks